Skip navigation

News

New plant II

Infastaubs former plant II has moved from Bad Homburg to its new site – just a few kilometres away from the main production facility. The removal was necessary because of the terminated leasing contract.

Infastaub found a new place in Oberursel and purchased the 2,300 m² sized property including production hall. „We are happy that we found a long-term prospect for our company with this production site“, says General Manager Berthold Geppert. The area „An den 3 Hasen“gives enough space for growth.

A total of 1,200 pieces and six welding places had to be moved. Prior to the move the entire plant was converted. Beside groundwork, a new electrical power supply, crane systems and column-mounted slewing cranes, the welding fume exhaust system was renewed. The filter unit is now controllable directly from each working place. In addition Infastaub paved the way for a white production and an inspection hall. Now the storage facility and production site are tailor-made for the needs and processes of Infastaub.

„The new production site in Oberursel gives us the chance to expand our growth opportunities consistently and continuously. With our established staff and a considerably bigger premises, we can realize the expansion of our filter series“, says Joachim Lamberti, Production Manager at Infastaub. The removal to the new plant took place in the second half of December 2014 without disturbance of production.

Market place

You find the market place for used filter units here.

Downloads

You find all manuals PDF files here.

Trade fairs

You find all upcoming fair dates here.

Newsletter

Sign up here for our newsletterand make sure to receive free tickets for our trade fairs.